Customization: | Available |
---|---|
Oil or Not: | Compressor |
Structure: | Rotary Vacuum Pump |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Vacuum the cavity of the plaster mixer to remove air bubbles in the plaster slurry.
Vacuum pump Specifications | |||||||||
Model | Speed Rate m3/h |
Limit pressure Pa |
Power KW |
Max water air absorption capacity kg/h |
Inlet dia of air Inch |
Pump rpm Rpm |
Oil consumption L |
Weight Kg |
Size L*W*H cm |
SVF010 SVC010 |
10 | 80 | 0.37/0.55 | 0.02 | G1/2 | 1400 | 0.5 | 18 | 41*24*21 |
SVF020 SVC020 |
20 | 80 | 0.75/0.9 | 0.04 | G1/2 | 2800 | 0.5 | 20 | 41*24*21 |
SVF040 SVC040 |
40 | 50 | 1.1 | 0.75 | G11/4 | 1400 | 1.3 | 48 | 63*29*26 |
SVF063 SVC063 |
63 | 50 | 1.5 | 1 | G11/4 | 1400 | 1.3 | 50 | 66*30*27 |
SVF080 SVC080 |
80 | 50 | 2.2 | 1.5 | G11/4 | 2800 | 1.3 | 50 | 66*30*27 |
SVF100 SVC100 |
100 | 50 | 3 | 1.6 | G11/4 | 1420 | 2 | 70 | 73*41*29 |
SVF160 SVC160 |
160 | 50 | 4 | 2.7 | G2 | 1440 | 5 | 160 | 90*54*45 |
SVF200 SVC200 |
200 | 50 | 5.5 | 3.4 | G2 | 1440 | 5 | 160 | 90*54*45 |
SVF250 SVC250 |
250 | 50 | 5.5/7.5 | 4.4 | G2 | 1440 | 5 | 190 | 100*54*45 |
SVF300 SVC300 |
300 | 50 | 7.5 | 5.4 | G2 | 1440 | 5 | 220 | 106*54*45 |
SVF630 SVC630 |
630 | 50 | 15 | 10 | G3 | 1440 | 15 | 640 | 150*90*76 |
Suction vacuum is realized by a direct-connected rotary vane vacuum pump. The vacuum pump is automatically controlled by the start button and the electric contact vacuum gauge. In the initial state, the start button starts the vacuum pump, and the gas in the mixing tank is sucked out by the vacuum pump, so that negative pressure is formed in the tank. The vacuum degree in the tank is displayed and controlled by the electric contact vacuum gauge. When the specified upper limit is reached, the vacuum pump will automatically stop running. There is a vacuum liquid dust filter (VAF-32) and a one-way valve between the vacuum pump and the mixing barrel. The function of the filter is to prevent impurities from entering the vacuum pump, and the one-way valve is to prevent the air from returning when the vacuum pump stops working.
Q1. How long will your engineer reach our factory?
Our After-sales Specialist would contact with you, confirm the final scheduling according to your reasonable request.
Q2. How many days will you finish installing?
We will finish installation and training according to the machine model.
Q3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets, SIM card, hotel, food and local traffic.
Q4. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.
Q5. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 100USD/day.
Q6. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
Q7. Does your engineer understand English?
Our engineers understand a little English. All of our engineer have more than five years machine installation experience. In addition, they can use body language to communicate with customer.
Q8. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time. Our after-sales department has 30 engineers. Our engineers will take a solution video according your description.