• Water Closet Cistern and Tank Lifting Casting Battery Casting Line
  • Water Closet Cistern and Tank Lifting Casting Battery Casting Line
  • Water Closet Cistern and Tank Lifting Casting Battery Casting Line
  • Water Closet Cistern and Tank Lifting Casting Battery Casting Line
  • Water Closet Cistern and Tank Lifting Casting Battery Casting Line
  • Water Closet Cistern and Tank Lifting Casting Battery Casting Line

Water Closet Cistern and Tank Lifting Casting Battery Casting Line

Casting Bench Length: 18-30m
Mold: Plaster Mold
PLC: Siemens
Electric Elements: Schneider or Omron
Casting Pipe: 304 Stainless Steel
Casting Method: Auto
Customization:
Diamond Member Since 2021

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Working principle
Overview

Basic Info.

Model NO.
LC-Tank
Product
Tank and Cistern
Lifting Method
Sling or Screw
Transport Package
Container by Sea Transport
Specification
50-70sets working mold
Trademark
HEXIANG
Origin
China
HS Code
8474809090
Production Capacity
18-30PCS/Per Bench

Product Description

Product Description

The equipment is used to produce cistern tank, the upper mold is lifted integrally to save the producing efficiency, reducer labor strength. Every casting bench can load 18-30 sets plaster mold, every day cast 1-2 times. This machine can realize auto feeding slip, auto micro-pressure consolidate, auto return slip, improve producing pass rate. The green base storage base has two layers to save space, esay second days repairing.
 

Detailed Photos
Water Closet Cistern and Tank Lifting Casting Battery Casting Line
It mainly includes:
Main frame
Lifting frame of bottom mold
Press of air belt
Hook rod
Transmission shaft
Main bench
Pneumatic unloading base carrier
Two layers store the greenwares for drying
Micro-pressure pipe system
Control system
Travel switch
Supply slip system

 
 
Product Parameters
Parameter Unit    
Ground Line Length M 15-30 Depends on customer capacity
Top line Length M 15-30  
Width MM 510  
Height MM 620 Maximum Height
Length of Storage Platform M 15-30  
Width of Storage Platform MM 645  
Height of Storage Platform MM 520  
Size of Whole Line mm 15190-32000x4400x3795 Line size only
Molds Available set 18-40 depends on the size of the molds
Ground Incline   12  
Ground Incline adjustable scale   10-14  

Power
kw 2.2 Power of Main Motor
kw 2.2  
kw N/A Power of Lights
kw N/A Power of Fans
Air Pressure MPa ≥0.6  


Installation Ground Needed
Length(M) 3.6 3.6meter for each line
Width(M) 4.5  
Width(M) 21+2 Minimum width needed
Width(M) 15-30+2+3 Minimum width for casting line running
Working principle
(1) Main mold closing:
   Locate the clamp car and the casting bench with the bolt and clamp all the molds by rolling the clamp handle.
(2) Bottom mold closing:
Press the "Down" button to make the lifting frame decline until entire molds close completely
(3) Hooker joint:
Push the hooker position handle upward step by step and make the hooker down to inset the hook seat slot hole under the casting
bench
(4) Hold down of bottom mold:
Fill the compressed air into the air bag which will jack up the lifting frame accordingly
(5) Slip supply, slip drain and greenwares hard
(6) Loose of bottom mold:
Discharge the compressor air in air bag until completely down of lifting frame.
(7) Break-away of the hook:
The cylinder retracts to drive the hook rotating counter clockwise
(8) De-molding of bottom mold:

Press the "up/down" button to lift the hoisting frame and drive the bottom mold open slowly to avoid the green body damage caused by
strain.
 (9) De-molding of the main mold:
Loose the handle of clamp carrier and extract the pin, pull the clamp carrier to the end of casting bench, pull the main mold accordingly to let the green body dry first so that assure come strength before rolling-over.
(10) Unloading and take off of base:
Turn over the molds and store the greenwares in the storage platform
(11) Green base storage line with two layers.

 

Water Closet Cistern and Tank Lifting Casting Battery Casting Line

Water Closet Cistern and Tank Lifting Casting Battery Casting LineWater Closet Cistern and Tank Lifting Casting Battery Casting LineWater Closet Cistern and Tank Lifting Casting Battery Casting LineWater Closet Cistern and Tank Lifting Casting Battery Casting LineWater Closet Cistern and Tank Lifting Casting Battery Casting LineWater Closet Cistern and Tank Lifting Casting Battery Casting Line

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now